At
Block 762, we can see some minor works done on the external wall. This is due to debonded crack bricks on the
level 9. The area is now barricaded so please do not breach it for your own safety.
HDB has inspected and confirmed that this was not structural defect
thus the integrity of the building is intact.
Patchwork will be carried out and following that, an inspection will be
carried out from block 762 to 771 to spot for any similar problems and will
be rectified immediately.